Components |
 |
|
|
Systems |
 |
|
|
|
Facilities |
|
 |
|
|
 |
|
|
|
|
Our MECHATRON®
Systems will improve your
Competitive
Advantage!! |
 |
Higher Levels of utilization of machines |
 |
Higher levels of utilization of machines that
are expensive and represent a significant
investment thereby reducing capital cost per
unit produced.
Example:
Rs. 25 lakhs testing equipment with a cycle time
of 6 seconds was able to test 2800 components in
1 shift. Introducing a Mechatron® Pick and Place
System increased the throughput to 4000 per
shift. |
Higher levels of productivity per person |
 |
Higher levels of productivity per person
enabling the best use of your workers in
quality, supervision and other such value added
tasks, rather than mundane and repetitive
component handling.
The manufacturing of 18,000 assemblies per day
which was being done with 38 people, is now
being done on our assembly station with only 3
people per shift. This allows the operators to
concentrate more on the visual inspection of the
finished assembly. |
Consistency in quality |
 |
Consistency in quality by eliminating the
possibility of worker fatigue causing improper
loading/unloading of a part.
Example:
In a cold forging application improper manual
loading (not resting firmly against the stopper)
was leading to a 1.7% rejection. This was
brought down to almost Zero with the
introduction of a Pick and Place System. |
Consistency in
production |
 |
Consistency in production throughout the day,
by ensuring that the feeding systems speed
determines the production and not the worker.
Example:
A double component loading Pick & Place System
has increased the production output from a
crimping machine to 9,600/- per day from a
manual production of 3000-7000 per day (with an
average of 5000 per day) almost doubling the
output from the same crimping machine. Further a
single operator can handle 3 such machines. |
|
|