All our systems, prior to despatch, undergo
rigorous testing to ensure a guaranteed
non-stop functioning at the customers' site.
All possible uncertainties are identified
and eliminated during these trials at our
site.
Our testings start at a very early stage of
the project, with the Mock Up testing, which
helps to understand critical areas of the
design and it provides valuable data for the
design team on various parameters related to
the process and the component that is being
handled. It helps to validate the concept
and to unearth any underlying uncertainties,
which when removed at such early stage,
saves development time and effort.
All individual subsystems, upon assembly are
tested separately to ensure their proper
functioning. This testing helps us in later
identifying the problems that could arise
during final assembly. This step-by-step
testing of subsystems allows debugging, if
any, at an earlier stage itself.
The full assembly is then tested for
evaluating the overall performance such as
functional requirements, cycle time, etc..
The Assembly is tested with dummy cycles to
start with, and is then continued with
components under the various possible
operating conditions.
Following this, the electronic integration
with the system is completed and the system
is put to test under different conditions.
The specific end user at the customers
organisation is invited to monitor the
continuous trials of the system so as to
receive his inputs on any site related
parameters which we have not taken into
account so far. The system is put to
continuous testing to gauge the reliability
of the system before despatch. This also
reduces the time it takes for installing and
commissioning the system at our customer's
site. Test reports are documented and sent
to the customer for validation.
The parent machine to be integrated to our
system, if any, is simulated at our site for
the dimensional and functional requirements.
This too helps in reducing the time taken
for integration with the parent machine at
the customers' site. The system is also put
to accelerated testing to monitor the
functionality of the systems under
accelerated test conditions. This gives a
better picture of the reliability of the
system and the life of the system. |
|
|